In this session we installed the wi-fi door into the annexe gate.
Removed the annexe gate and took it into the workshop.To big for the workbench I need to lay it on the floor - outside face down.
We will need to remove all the gate hardware.
About to cut out the wire mesh with small bolt cutters.
Fitting the frame top timber.
That's a long reach Locking C - Clamp
Frame top is done.
That's enough for today, tomorrow I can start fitting the wi-fi valve aka wi-fi actuator.
No comments:
Post a Comment