Finish pebble back filling
After finishing and tidying up in the chook run we are back outside to finish backfilling the pebbles.
Getting ready to staple the edge of the cage wire.Finish pebble back filling
After finishing and tidying up in the chook run we are back outside to finish backfilling the pebbles.
Getting ready to staple the edge of the cage wire.Finishing inside the cook run.
As posted yesterday before I can finish the last bit of pebble backfilling there's some work to do inside the chook run - in that corner..Backfilling the drain
Weather cleared nicely; was able to go out and do some more like back fill the drain with soil and back fill the top end of the PVC pipe with gravel.Been busy doing other things but now back to garage drainage
After three days of inclement weather and not being able to pick up tools (downed tools) it's good to come out of hibernation.
More kneeling... need to cut out the end of that angled timber so the corner grate can line up with the PVC pipe.Back home from Bunning with some drainage stuff.
4 x Everhard Compact 1M drain and 1 x Corner.
More digging...lolLucky that I have this one and only 4.3M 90mm PVC pipe leftover from a previous job.
I call it Al's Workshop but it's simply a colorbond steel garage with four skylights, two back windows, side entry door and front roller door.