Showing posts with label Pitfield Makeover. Show all posts
Showing posts with label Pitfield Makeover. Show all posts

Thursday, December 10, 2015

Pitfield makeover 12

Continuing on with making the spa cover I’ve reinforced the corners with paling off-cuts.

20151214_13212620151214_132132

The whole thing now holds it’s shape quite well when picked up and moved around.

Pitfield makeover 11


Next job is to clean up the spa area and for me to make a new cover. I’ve already been working in that area to cut down and remove the spa pergola and the main reason for doing that job at that time was to have some more timber available to build the spa box – which was the last job.

The spa was never used, all that’s left of the cover is deteriorating Styrofoam panels.

Wednesday, December 9, 2015

Pitfield makeover 10

Moving on from the sides last stage with this job is the front.

20151209_13415720151209_141546

Like the top it needs to be removable to access the spa equipment. I’m down to the last of the palings including a few warped ones.

Pitfield makeover 9

Having completed the spa top cover we can move onto boarding in the sides. About to add a couple of back supports for the palings to screw onto.

20151208_133226

Not everything is square here so decided to play safe and ‘screw tack’ the palings on to get the spacing and other stuff right, then run a pencil line down each front pine support for cutting to length.

Tuesday, December 8, 2015

Monday, December 7, 2015

Pitfield makeover 7b

Next job on the list after demolishing the spa pergola is to hide the spa equipment itself to make it more presentable for sale.




Had some thoughts about using fence lattice but we need to do better than that. Just trying to keep the costs down, what else do we have on hand?

Pitfield makeover 7c

One thing I noticed previously and nearly forgot about is that the spa air switch needs attention.



The nipples have broken off with the ends still in the plastic tubes.

Pitfield makeover 7a

We also have some K9 helpers on the job site.

20151205_160341

Mindy

Sunday, December 6, 2015

Pitfield makeover 6

In between the bigger jobs I’m also taking care of the - smaller jobs. When cleaning up the side of the house I noticed that the garage side door does not close and lock properly. That’s the door behind today’s painting team.

Pitfield makeover 5

Moving on we need to remove the spa pergola as part of the clean-up.

20151203_141624  20151203_141631

Cutting the beams with a power saw – straight forward.

Friday, December 4, 2015

Pitfield makeover 4

After cleaning up the side of the house we now move around to the back to continue the ‘demolition’ work.

   

Picking up from the clean-up along the side and turning the corner we need to remove that illegal timber gate that somehow became part of the spa fencing.

Thursday, December 3, 2015

Pitfield makeover 3

Moving on from the gate repair next job is to clean up this side of the house that has beams between the house and the fence with shade mesh on top.

20151203_141540  20151203_141559

Remove all the rotten beams that sloped down from the fascia to the top of the fence along with the shade mesh and drill out the joist hangers that were pop riveted to the fascia.

Pitfield makeover 2

Painting team following up the next day after I repaired the side gate.

20151205_160314

Wednesday, December 2, 2015

Pitfield property makeover 1



Big project for the next few weeks to help the older daughter prepare her property for sale. We have a job list so loaded the car last night and hopefully thought of everything I might need.

Another new toy for kitties.