The plywood top of the box needs replacing.
Took a shortcut and replaced the top without removing the whole thing which worked out OK.
Cut a piece of plywood in the workshop.
The plywood top of the box needs replacing.
Took a shortcut and replaced the top without removing the whole thing which worked out OK.
Cut a piece of plywood in the workshop.
Erratic operation and then the lights would not turn on when power was turned off and then on.
Yellow bin is recycle and Green garden & kitchen waste.
This week Yellow is chockers due mainly to the concurrent annual hard waste collection so I've been doing the rounds collecting whatever can go out.
Before the trucks come around council inspectors have been monitoring bin contents to check that residents are following the bin sorting rules - they are watching! Some neighbours have had their bins tagged warning and notifying to follow the rules.
Anyway... went out this morning with another hand full for the Yellow bin a we have - been tagged!
Not able to really get out the last few days but did manage late yesterday when the cloud cover moved on and the sun came out to fill in holes with homemade putty. Sawdust mixed with watered down PVC glue. I should be able to sand down this afternoon.
Screwed on that last board at the back of the table and braced the legs.
With the last board screwed down there's bit of bracing sticking out; that was planned because I'll run some timber along the back to stop stuff falling of the back edge of the table.I made this BBQ table (with bench seats) from left over hardwood flooring after the house was built - 50 years ago!
Anyway... did I say refurbish it's actually a tear down and salvage what I can.