Moving on from the sides last stage with this job is the front.
Like the top it needs to be removable to access the spa equipment. I’m down to the last of the palings including a few warped ones.
Wheelie bin with a board on top makes a convenient worktop - to save the back.
Hooray…we are done with the spa box, As before the painting team will be along in due course.
No comments:
Post a Comment