From the last session prepared the cables with connectors.
Now to run the cables down and into the base box.
From the last session prepared the cables with connectors.
Now to run the cables down and into the base box.
From the last session I was going make a knob for the blade tracking threaded rod but decided to install the front mounted NVR power switch and wire up the saw motor.
Finished the tension leaf spring (damper).
Move on now to making the tension rod crank handle. From MDF the handle itself plus two blocks to hold the 5/16” nut coupler.
The upper wheel assembly still needs a tension leaf spring which acts like a damper to absorb upper saw vibrations. This also prolongs blade life.
Completed the under table bracing making sure I aligned things as I went along.