Dropdown Menu
- My Home
- Pets
- Workshop 1
- Workshop 2
- Al's Workshop
Monday, October 31, 2022
Bailey - Stairwell barriers 1
Bailey update
Day 2 and whenever we get a chance like when the boy is having a snooze we tend to our puncture wounds.
Wednesday, October 26, 2022
Rock wall garden edging - Part 1
Removing excess soil
It's surprising how much soil washes in from the top garden level through the rock wall to overfill the narrow garden bed. So much that the metal garden edging is bulging out in places and looks unsightly.
I actually started this job a couple of day go by digging or rather scooping out soil along the back of the edging.
Sunday, October 23, 2022
Workshop drainage - Part 12 Final
Finish pebble back filling
After finishing and tidying up in the chook run we are back outside to finish backfilling the pebbles.
Getting ready to staple the edge of the cage wire.Workshop drainage - Part 11
Finishing inside the cook run.
As posted yesterday before I can finish the last bit of pebble backfilling there's some work to do inside the chook run - in that corner..Saturday, October 22, 2022
Workshop drainage - part 10
Backfilling the drain
Weather cleared nicely; was able to go out and do some more like back fill the drain with soil and back fill the top end of the PVC pipe with gravel.Friday, October 21, 2022
Workshop drainage - part 9
Thursday, October 20, 2022
Workshop drainage - part 8
Workshop drainage - part 7
Been busy doing other things but now back to garage drainage
Monday, October 17, 2022
Garage drainage - part 6
Sunday, October 16, 2022
Garage drainage - part 5
After three days of inclement weather and not being able to pick up tools (downed tools) it's good to come out of hibernation.
More kneeling... need to cut out the end of that angled timber so the corner grate can line up with the PVC pipe.Wednesday, October 12, 2022
Garage drainage - part 4
Back home from Bunning with some drainage stuff.
4 x Everhard Compact 1M drain and 1 x Corner.
More digging...lolTuesday, October 11, 2022
New plants to replace Jasmine
Monday, October 10, 2022
Garage drainage - part 2
Lucky that I have this one and only 4.3M 90mm PVC pipe leftover from a previous job.
Sunday, October 9, 2022
Bunnings - New work boots!
Saturday, October 8, 2022
Garage drainage - part 1
I call it Al's Workshop but it's simply a colorbond steel garage with four skylights, two back windows, side entry door and front roller door.
Thursday, October 6, 2022
Wednesday, October 5, 2022
Sunday, October 2, 2022
Saturday, October 1, 2022
Speckles in the laundry.
Medion Wireless Rear View Mirror - Revisited
Purchased this from ALDI in August 2015 and earlier this year it stopped working. I have been dealing all year with the left eyeball and poo...
-
SK5 steel, non stick coated cutting blade Includes saw attachment Telescopic aluminium pole Ideal for sawing or lopping hard to reach p...
-
Suitable for use in the chook run where there is 240V power for the 12V power supply or powered from 12V SLA battery (also solar panel) for ...