Dropdown Menu
- My Home
- Pets
- Workshop 1
- Workshop 2
- Al's Workshop
Sunday, October 23, 2022
Workshop drainage - Part 12 Final
Finish pebble back filling
After finishing and tidying up in the chook run we are back outside to finish backfilling the pebbles.
Getting ready to staple the edge of the cage wire.Workshop drainage - Part 11
Finishing inside the cook run.
As posted yesterday before I can finish the last bit of pebble backfilling there's some work to do inside the chook run - in that corner..Saturday, October 22, 2022
Workshop drainage - part 10
Backfilling the drain
Weather cleared nicely; was able to go out and do some more like back fill the drain with soil and back fill the top end of the PVC pipe with gravel.Friday, October 21, 2022
Workshop drainage - part 9
Thursday, October 20, 2022
Workshop drainage - part 8
Workshop drainage - part 7
Been busy doing other things but now back to garage drainage
Back from Bunnings with more bage of concrete mix and backfill pebbles.
Subscribe to:
Posts (Atom)
-
With the Wi-Fi Valve setup and operating we can start making the door frame and the actual door that will slide up and down inside a frame. ...
-
Suitable for use in the chook run where there is 240V power for the 12V power supply or powered from 12V SLA battery (also solar panel) for ...
-
Thermoelectric technology Celsius or Fahrenheit switch, digital temperature range from 8-18 degrees. 50(h) x 25 (d) x 49.5 (w)cm The ba...