Rather that fill the whole trench with concrete I'm just doing pads under the joints.
This is the left or fence side.
After three days of inclement weather and not being able to pick up tools (downed tools) it's good to come out of hibernation.
More kneeling... need to cut out the end of that angled timber so the corner grate can line up with the PVC pipe.Back home from Bunning with some drainage stuff.
4 x Everhard Compact 1M drain and 1 x Corner.
More digging...lol