Dropdown Menu
- My Home
- Pets
- Workshop 1
- Workshop 2
- Al's Workshop
- Projects 1
- Projects 2
- Technology
- Hobby
- My Diary
Thursday, September 5, 2019
Wednesday, September 4, 2019
MSCD Reception Sign - Part 1
This is another job for the Melbourne School Of Classical Dance.
Printed the logo image on glossy photo paper.
Friday, August 23, 2019
Ballerina wall feature - Part 9
Ballerina wall feature - Part 8
We are using a 12V 5M LED strip which I am cutting at the most convenient 12V supply cut point to turn corners and the bridging with hook-up wire.
Wednesday, August 21, 2019
Ballerina wall feature - Part 7
Here we are just glued and tacked the moulding to the inside edge of the frame.
I placed the ballerina in there to get an idea of how she'll look - that's good.
Ballerina wall feature - Part 6
Fortunately the weather look nice today so out this morning while the sun is out to spray paint the bnallerina.
Tuesday, August 20, 2019
Ballerina wall feature - Part 5
For this session we are back on the picture frame to fix picture moulding around the inside edge of the dressed pine timber.
Subscribe to:
Posts (Atom)
-
With the Wi-Fi Valve setup and operating we can start making the door frame and the actual door that will slide up and down inside a frame. ...
-
Suitable for use in the chook run where there is 240V power for the 12V power supply or powered from 12V SLA battery (also solar panel) for ...