Picking up from where I left this morning…
we will continue with the ‘leaf spring’.
The upper wheel assembly still needs a tension leaf spring which acts like a damper to absorb upper saw vibrations. This also prolongs blade life.
Completed the under table bracing making sure I aligned things as I went along.
With the upper blade guides completed and before moving on to the lower guides I’ll do some more work on the table. Even though this is a temporary one it still needs to be sturdy and square in all directions with respect to the blade.
Using a Stanley roofing square to check across and down the table.
From the previous session we finished with the thrust bearing sliding arm, which also contains the sliding guide block from the top, which is now ready to drill and file a slotted hole through which will pass a 5/16th rod.
Need to drill out the pilot hole with a 6.5mm bit and the run through a 5/15th tap.