This one is finished, sent these photos to the Geelong customer and she is very happy.
Dropdown Menu
- My Home
- Pets
- Workshop 1
- Workshop 2
- Al's Workshop
- Projects 1
- Projects 2
- Technology
- Hobby
- My Diary
Monday, June 29, 2020
Sunday, June 28, 2020
Al's Workshop - condensation issues
Fortunately it's down both walkways so not a big deal. Thinking about what I could use along those purlins to absorb the moisture?
Saturday, June 27, 2020
BlitzWolf Smart Watch - updates
F1 Facing Car - part 3
Finished installing the LED strip and mounted the car onto the back board.
With the LED strip terminated we can now mount the car.
Friday, June 26, 2020
Subscribe to:
Posts (Atom)
-
With the Wi-Fi Valve setup and operating we can start making the door frame and the actual door that will slide up and down inside a frame. ...
-
Suitable for use in the chook run where there is 240V power for the 12V power supply or powered from 12V SLA battery (also solar panel) for ...
-
Early start this morning (for us retirees) to get to ALDI before opening time so we don’t miss out on the sewing machine and table. We were ...