From the previous session we finished with the thrust bearing sliding arm, which also contains the sliding guide block from the top, which is now ready to drill and file a slotted hole through which will pass a 5/16th rod.
Need to drill out the pilot hole with a 6.5mm bit and the run through a 5/15th tap.